Every major UK provider
Compare broadband deals for your new home.
Check what your new address can get, compare the real total cost and be online the day you move in.
Enter your postcode to see the deals available there
The short answer
Order broadband about four weeks before you move so you are online on day one. If you are in contract, ask your provider to move it to your new address; you may need to re-contract. 82% of UK homes can now get full fibre, so check what's available at your new postcode.
Ofcom Connected Nations, January 2026; provider guidance, 2026
What you get
Deals for the new address, not the old one.
- Enter the new postcode to see what can reach the home.
- Full fibre and other connections shown separately.
- Order about four weeks ahead to be online on day one.
What's available at the new home.
- Full fibreCheck Fibre all the way into the home.
- Part fibreCheck Fibre to the street cabinet, copper to the door.
- Order by4 weeks ahead
- InstallationBook for move day
Before you switch
Finding the right broadband deal.
What you can get depends on the exact address: full fibre, cable or part-fibre. Check the new home first, pick the speed your household actually needs, and order four weeks before you move.
Enter the postcode above to see the deals available at that address, with the monthly price, the price rises in pounds and the contract length side by side.
The options
Types of broadband.
Standard Broadband
ADSL broadband delivered through phone lines. Average speeds of 10-11 Mbps suitable for basic browsing and email.
Fibre Broadband
Fibre-to-the-cabinet (FTTC) delivering speeds of 35-67 Mbps. Ideal for households with multiple devices and HD streaming.
Full Fibre / Ultrafast
Fibre-to-the-premises (FTTP) with speeds up to 1000 Mbps. Perfect for heavy users, 4K streaming, and online gaming.
The numbers that matter
Broadband, in four numbers.
What speed you need
A rough guide, by household.
Average speeds matter more than "up to" speeds. Pick the tier that covers everyone online at the busiest time of the evening.
Our guide to typical household needs. Ofcom found the average maximum download speed was 285 Mbps in 2025.
Moving home
Online on moving day.
-
4–8 weeks before
Check what the new home can get
Full fibre, cable or part-fibre depends on the exact address. Check before you choose a deal.
-
4 weeks before
Order the new connection
Openreach needs about 14 days at the least. A home with no working line may need an engineer and take longer.
-
Before you sign
Check the total cost
Add up the monthly price, the price rises in pounds, set-up fees and the contract length.
-
Moving day
Plug in and test
Run a speed test at the busiest time of evening in the first week and keep the result.
Before you choose
Questions worth asking.
“What speed will I actually get at this address?”
Providers should tell you the speed to expect at your address before you sign; ask for the figure in writing.
“What does the price rise to, and when?”
Since January 2025 rises must be set out in pounds and pence in the contract.
“Is there a set-up or engineer fee?”
It can make a cheaper monthly price cost more overall.
“Can I take the contract to my next home?”
If you might move again within the contract, check the moving and exit terms.
Watch out for
Where it goes wrong.
Ordering too late
Leave it to the week of the move and you may wait two weeks or more without broadband.
Comparing "up to" speeds
Look at average peak-time speeds; that's what you'll feel at 8pm.
Rolling onto out-of-contract prices
Providers must remind you when your deal ends. Act on it or you'll likely pay more.
Missing social tariffs
If you get certain benefits, social tariffs cost £12 to £20 a month.
FAQ
What people ask us.
How long does it take to set up broadband in a new home?
About two weeks at the least on the Openreach network, and longer if an engineer needs to install a line. Order four weeks before you move.
Can I get full fibre?
82% of UK homes could get full fibre in January 2026. Enter your postcode above to see what your address can get.
Do I need to cancel my old provider?
If you switch provider at the same address, the new provider handles it under One Touch Switch. When you move home, tell your current provider your moving date.
Can my price go up mid-contract?
Only as set out in pounds and pence in your contract for contracts since 17 January 2025. A rise not in your contract lets you leave without a penalty.
Can I take my broadband with me when I move?
Often, yes. Many providers can move your contract to the new address if they serve it, though some restart the minimum term or charge a home move fee. Check your contract and ask before you move.
Can I set up broadband before completion?
Yes. Order once you know your moving date, usually at exchange, and choose moving day as the start date. Nothing goes live or costs you anything until then.
How do I get internet while I wait for my new line?
Use your phone as a hotspot, or get a 4G or 5G router on a short contract to cover the gap until the line is live.
Do I pay a cancellation fee if I move house?
Only if your contract says so. If your provider can't supply the new address, many will let you leave without an early exit fee, but check the terms first.
Figures checked 21 November 2026
Prices and availability come from the providers and can change. Check the full terms before you sign up.
Sources: Ofcom Connected Nations · Ofcom price rise rules · Openreach: moving home · Uswitch broadband
The rest of your move
Everything else, in one place.
Two minutes, one postcode
Ready to switch?
Compare broadband deals from all major UK providers and find the perfect package for your new home
Find deals
Buy
Rent
Prices
New
Sell
